SWCC Applicant Turbines

ICC-SWCC labels, certificates and summary reports are accessible below for all current certified turbines. Turbines that have applied for, but have not yet been granted certification are also listed.

ICC-SWCC Certification Number Company Turbine Model Standard Original Certification Date Annual Energy Production Sound Level Rated Power Peak Power Status Expiration Date Status
SWCC-11-04SD Wind Energy, Ltd.SD6AWEA 9.1 (2009)
06/17/20198,950 kWh43.1 dB(A)5.2 kW6.1 kW @ 17m/sCertified07/01/2024Certified
SWCC-18-02Hi VAWT Technology CorpDS3000AWEA 9.1 (2009)
05/10/20192,460 kWh42.3 dB(A)1.4 kW1.4 kW @ 10.5 m/sCertified07/01/2024Certified
SWCC-16-05Bergey Windpower Co.Excel 15AWEA 9.1 (2009)
02/05/202129,800 kWh48.5 dB(A)15.6 kW20.6 kW @ 16 m/sCertified01/01/2025Certified
SWCC-10-20Wind Resource, LLCSkystream 3.7AWEA 9.1 (2009)
04/12/20233,420 kWh41.2 dB(A)2.1 kW2.4 kW @ 14.0 m/sCertified04/12/2025Certified
SWCC-10-16Eveready Diversified Products (Pty) Ltd.Kestrel e400nbAWEA 9.1 (2009)
02/14/20133,930 kWh55.6 dB(A)2.5 kW3.0 kW @ 19.5 m/sCertified04/01/2024Certified
SWCC-10-12Bergey Windpower Co.Excel 10AWEA 9.1 (2009)
11/16/201113,800 kWh42.9 dB(A)8.9 kW12.6 kW @ 16.5 m/sCertified01/01/2025Certified
"Certification Type" designates to which Standard(s) the applicant is pursuing SWCC certification: AWEA 9.1-2009 (AWEA), IEC 61400-1 (Design), IEC 61400-12-1 (Power Performance), and/or IEC 61400-11 (Acoustics).

"Under Contract" is the date that the Applicant executed a Certification Agreement with the SWCC.

"Under Test" is the date that the small wind turbine began collecting data at the test site after completion of installation, commissioning and instrumentation. "Certified Under MCS" indicates that the product is listed under the UK's Microgeneration Certification Scheme but SWCC has not yet conducted a review of data collected.

"Reports Submitted" is the date that the Applicant submitted a complete Test and Analysis Report to SWCC with a Certification Application.

"Conditional Temporary Certification" indicates that SWCC has granted this certification as defined in Section F5 of the SWCC Certification Policy. NOTE: SWCC labels, certificates and summary reports are pending for such turbines until they are awarded full SWCC certification. "Limited Power Performance Certification" indicates that SWCC has granted this certification as defined in Section F6 of the SWCC Certification Policy.

"Application Pending" designates that applicant has submitted complete Notice of Intent to Submit an Application (NOI), Configuration Description form, Preliminary Review Fee and has signed customized SWCC Certification Agreement confirming plans for testing and analysis.