SWCC Applicant Turbines

ICC-SWCC labels, certificates and summary reports are accessible below for all current certified turbines. Turbines that have applied for, but have not yet been granted certification are also listed.

ICC-SWCC Certification Number Company Turbine Model Standard Original Certification Date Annual Energy Production Sound Level Rated Power Peak Power Status Expiration Date Status
LPP-16-05Bergey Windpower Co.Excel 15AWEA 9.1-2009
06/04/201929,800 kWh49.3 dB(A)15.6 kW20.6 kW @ 16 m/sLimited Powered Performance Certificate06/01/2020Limited Powered Performance Certificate
SWCC-11-04SD Wind Energy, Ltd.SD6AWEA 9.1-2009
06/17/20198,9550 kWh43.1 dB(A)5.2 kW6.1 kW @ 17m/sCertified07/01/2020Certified
SWCC-18-02Hi VAWT Technology/Colite TechnologiesDS3000AWEA 9.1-2009
05/10/20192,460 kWh42.3 dB(A)1.4 kW1.4 kW @ 10.5 m/sCertified06/01/2020Certified
SWCC-16-02Bestwatt B.V.Bestwind 30AWEA 9.1-2009
01/13/201748,800 kWh49.8 dB(A)27.2 kW34.2 kW @ 16 m/sCertified02/01/2020Certified
SWCC-15-01Shanghai Ghrepower Green Energy Co., Ltd.FD21-50IEC 61400-11 & IEC 61400-12-1
04/30/2015128 MWh49.7 dB(A)61.2 kW @ 11.0 m/s65.6 kW @ 13.0 m/sCertified05/01/2020Certified
SWCC-10-20Xzeres Wind CorporationSkystream 3.7AWEA 9.1-2009
12/19/20113,420 kWh41.2 dB(A)2.1 kW2.4 kW @ 14.0 m/sCertified01/01/2020Certified
SWCC-10-12Bergey Windpower Co.Excel 10AWEA 9.1-2009
11/16/201113,800 kWh42.9 dB(A)8.9 kW12.6 kW @ 16.5 m/sCertified12/01/2019Certified
HiEnergy USA Inc.HE-3000 VAWTAWEA 9.1-2009
Application In ProcessApplication In Process
HiEnergy USA Inc.HE-300 VAWTAWEA 9.1-2009
Application In ProcessApplication In Process
Star Wind Turbines LLCStar 52-24AWEA 9.1-2009
Application In ProcessApplication In Process
Star Wind Turbines LLCStar 36-10AWEA 9.1-2009
Application In ProcessApplication In Process
"Certification Type" designates to which Standard(s) the applicant is pursuing SWCC certification: AWEA 9.1-2009 (AWEA), IEC 61400-1 (Design), IEC 61400-12-1 (Power Performance), and/or IEC 61400-11 (Acoustics).

"Under Contract" is the date that the Applicant executed a Certification Agreement with the SWCC.

"Under Test" is the date that the small wind turbine began collecting data at the test site after completion of installation, commissioning and instrumentation. "Certified Under MCS" indicates that the product is listed under the UK's Microgeneration Certification Scheme but SWCC has not yet conducted a review of data collected.

"Reports Submitted" is the date that the Applicant submitted a complete Test and Analysis Report to SWCC with a Certification Application.

"Conditional Temporary Certification" indicates that SWCC has granted this certification as defined in Section F5 of the SWCC Certification Policy. NOTE: SWCC labels, certificates and summary reports are pending for such turbines until they are awarded full SWCC certification. "Limited Power Performance Certification" indicates that SWCC has granted this certification as defined in Section F6 of the SWCC Certification Policy.

"Application Pending" designates that applicant has submitted complete Notice of Intent to Submit an Application (NOI), Configuration Description form, Preliminary Review Fee and has signed customized SWCC Certification Agreement confirming plans for testing and analysis.